Harbour Bridge

Tag details

Welcome to the 'Harbour Bridge' tag page at Technorati. This page features content from the farthest reaches of the Blogosphere that authors have "tagged" with 'Harbour Bridge'.

Look up Offsite Link "Harbour", Offsite Link "Bridge" at The Free Dictionary

Latest blogosphere posts tagged “Harbour Bridge”

  • Auckland Transport Year 2009 In Photos: Key Events


    Auckland TrainsAuthority Authority: 143
    We had a Mt Albert by-election which, thanks to the SH20 tunnel row, public transport and transport became the big issue, enabling us to discuss it with politicians: Labours David Shearer discusses the SH20 issue Greens Russel Norman at an election rally as a cardboard Melissa watched On a public open day ...
    20 hours ago
  • Sydney Australia Top 10 Things To Do


    Travel, Travel Vacations, Travel City, European Travel and more InformationsAuthority Authority: 451
    Sydney Top Ten Things To DoAustralia has always been known as a sun lovin’, free-wheelin’, beer drinkin’ country with people to match who have a like for the simple life. But one of the country’s most iconic cities has done much over the years to shed itself of this stigma, making a refined class and [...]
    1 week ago
  • If no one shows up, is it still news?


    Relevant NewsAuthority Authority: 178
    Photographers covering protests in many parts of the world need to consider logistics, politics and, above all, their personal safety. In Australia, one of the main considerations is whether to cover the event at all. Last week my colleague Ahmad Masood wrote a noteworthy blog highlighting the stark difference between ...
    1 week ago
  • New $3b Auck. Harbour Bridge Plan Details Released


    Auckland TrainsAuthority Authority: 143
    The group proposing a new Auckland harbour bridge, which commemorates Anzac, has made public its feasibility study providing costings and technical details. The proposal has been presented to the NZTA board. At this week’s NZTA briefing on the problems with the present bridge’s clip-ons, the NZTA was ...
    2 weeks ago
  • Call For North Shore Rail Network By 2020


    Auckland TrainsAuthority Authority: 143
    North Shore’s mayor wants to take advantage of any decision over the next harbour crossing to push rail through the North Shore. Andrew Williams is calling  for there to be rail lines right up the “rail contoured” busway to Orewa in the north and south through the future CBD underground rail loop. “We need ...
    2 weeks ago
  • What’s In The Bridge Engineering Report That Caused The Crisis


    Auckland TrainsAuthority Authority: 143
    Today’s rush of activity around the state and future of the Auckland Harbour Bridge follows the delivery of an engineering report which warns the agency: “The bridge is a major steel structure so the current “level of service” will be reduced when either the bridge load capacity is exceeded and can’t be ...
    2 weeks ago
  • Steven: May Not Be Tunnel, But No Hurry


    Auckland TrainsAuthority Authority: 143
    Steven Joyce says he has not yet formed a view on whether a tunnel or a bridge is most appropriate for Auckland’s next crossing. NZTA today revealed it favours a tunnel but the minister of transport says he has not yet made up his mind. As to when we might start work on something, the minister  said: “It ...
    2 weeks ago
  • Bridge Only Has 20 Years Left, NZTA Moves For Harbour Tunnel


    Auckland TrainsAuthority Authority: 143
    Major developments this afternoon on a third Auckland harbour crossing as concerns grows about how long the present bridge can function. The transport agency says in 20 years time the present Auckland Harbour Bridge will be nearing its life as a state highway. Strengthening of the clip on lanes has given those ...
    2 weeks ago

  • the __earthincAuthority Authority: 125
    3 weeks ago
  • Toll Cycle / Pedestrian Pathway Plan For Harbour Bridge


    Auckland TrainsAuthority Authority: 143
    An innovative proposal is being presented to the transport agency for a shared pathway on the city-side clip-on of the Bridge so pedestrians and cyclists can cross the bridge. The proposed Pathway would be attached under the deck cantilever of the eastern clipon. The GetAcross plan would see this funded by ...
    3 weeks ago
  • Pavilion 21 Mini Opera Space Is The Best For Munich Opera 2010 Festival !


    vhxn.comAuthority Authority: 141
    The Munich Opera Festival 2010 will be shining with the latest and new Pavilion 21 MINI Opera Space. It is one of the greatest and tiniest designs by Wolf Prix for the festival. The maximum seating capacity of the design is just 300 but the designers have achieved a visually and acoustically pleasing lightweight ...
    3 weeks ago
  • $5m “Transparent” Bridge To Cross Harbour Bridge


    Auckland TrainsAuthority Authority: 143
    A footbridge across ten lanes of the Auckland Harbour Bridge is included in the Victoria Park tunnel project. And the latest idea talks about a of a kind of part transparent, part metallic bridge one costing between $3m and $5m that will become known as a “Gateway To Auckland.” I can’t work out if this is ...
    4 weeks ago

Comments about Harbour Bridge

Personal attacks are NOT allowed
Please read our comment policy